Quick Aged Paddy


Production Capacity : 680 tpa

Uploaded on : April 2009


Product and its applications

Rice tops the food grains cultivated in India , with annual production of more than 90 million tonnes. Rice is the staple food for majority of the population. It is a common experience that rice from freshly harvested paddy cooks to a pasty mass. It has poor swelling capacity during cooking and reportedly causes digestive disorders. That is the reason the new rice is aged or cured by storing for at least 4 months to overcome these problems and to develop desirable cooking characteristics. The ageing becomes faster as the temperature during storage increases. A new technology has been developed whereby it has become possible to age or cure the new paddy within a short duration.


Market Potential

Aged rice commands a higher price as compared to new rice. There is an incentive to cure the paddy in a short time and speed up the realisation. Quick aging helps in cutting down the cost of warehousing, reduce damage by rodents, save interest on the capital, thereby improve overall economic profile of the project.


Basis and Presumption

  • The unit proposes to work at least 120 days per annum on single shift basis. However, the production activity will be available only for 100 days.
  • The unit can achieve its full capacity utilization during the 2nd year of operation.
  • The wages for workers are taken as per prevailing rates in this type of industry.
  • Interest rate for total capital investment is calculated @ 12% per annum.
  • The entrepreneur is expected to raise 20-25% of the capital as margin money.
  • The unit proposes to construct own building while the cost of construction is based inputs.
  • Costs of machinery and equipment are based on average price.

Implementation Schedule

Project implementation will take a period of 8 months. Break-up of the activities and relative time for each activity is shown below:

Scheme preparation and approval 01 month
SSI provisional registration 1-2 months
Sanction of financial supports etc 2-5 months
Installation of machinery and power connection 6-8 months
Trial run and production 01 month

Technical Aspects


Process of Manufacture

The freshly harvested paddy is steamed for a specified period of time depending on the initial moisture content of the paddy. It is then heaped, dried and used for rice milling.


Quality Control and Standards

As per AGMARK specifications


Energy Conservation

The fuel for the steam generation in the boiler is coal or LDO depending upon the type of boiler. Proper care should be taken while utilising the fuel for the steam production. There should be no leakage of steam in the pipe lines and adequate insulation should be provided.


Production Capacity

Quantity 750 tpa
Installed capacity 8 tpa
Value Rs. 96.60 lakh
Optimum capacity utilization 70%
Working days 100/annum
Manpower 12
Utilities  
Motive Power 12 kWH
Water 5 kL/day
Coal/LD oil 250 kg/60 L/day

Financial Aspects


Fixed Capital


Land & Building

Particulars

Amount (Rs. lakh)

Land 1000m 2 02.00
Built up area 150 m 2 04.50
Total cost of land and building 06.50

Machinery and Equipment

Description

Amount (Rs. lakh)

Boiler, parboiling tank, mechanical drier/drying yard. Auxiliary equipment: weighing scales, trolleys etc. 03.85
Erection & electrification of machinery & equipment @10% cost 00.40
Office furniture & fixtures 00.75
Total 05.00

9.1.3 Pre-operative Expenses

Amount (Rs. lakh)

Consultancy fee, project report, deposits with electricity department etc 01.00

9.1.4 Total Fixed Capital

Amount (Rs. lakh)

(9.1.1+9.1.2+9.1.3) 12.50

Recurring expenses per annum


Personnel


Designation

No.

Salary Per month

Amount (Rs. lakh)

Factory Manager 1 10,000 01.20
Supervisory staff 2 07,500 01.80
Office Assistant 2 06,000 01.44
Technician 1 05,000 00.60
Skilled workers 2 03,500 00.84
      06.36
Perquisites @15 %     00.94
Total 12   07.30

Raw Material including packaging materials

Particulars

Qty (t)

Rate/t (Rs.)

Amount (Rs. lakh)

Chemicals LS LS 00.22
Packaging materials 7500 No. 11 each 00,83
Paddy 750 9500 71.25
Total     72.30

Utilities


Particulars

Amount (Rs. lakh)

Power 01.50
Water 00.05
Fuel 00.45
Total 02.00

Other Contingent Expenses


Particulars

Amount (Rs. lakh)

Repairs and maintenance @10% 00.50
Consumables & spares, others 00.10
Transport & travel 00.45
Publicity, postage, telephone 00.04
Insurance @1% 00.45
Total 00.82

Total Recurring Expenditure

(9.2.1 + 9.2.2 + 9.2.3 + 9.2.4)

83.00 (Rs. lakh)


9.3 Working Capital

Amount (Rs. lakh)

Recurring expenses for 1 month 06.90

9.4 Total Capital Investment

Amount (Rs. lakh)

Fixed capital (Refer 9.1.4) 12.50
Working capital (Refer 9.3) 06.90

Financial Analysis


Cost of Production (per annum)

Amount (Rs. lakh)

Recurring expenses (Refer 9.2.5) 83.00
Depreciation on building @ 5% 00.20
Depreciation on machinery @10% 00.42
Depreciation on furniture @ 20% 00.15
Interest on Capital Investment @ 12% 02.33
Total 86.10

Item

Qty (t)

Rate/t (Rs.)

Amount (Rs. lakh)

Aged paddy 680 14,500 98.60

Net Profit per year

   

=Sales – Cost of production
=98.60 - 86.10
=Rs. 12.50 lakh


Net Profit Ratio

   

Net profit X 100
---------------------

Sales


12.50X 100
---------------------

98.60

=12.67%


Rate of Return on Investment

   

Net profit X 100
---------------------

Capital Investment


12.50X 100
---------------------

I9.40

=64.4%


Break even Point

   

Annual Fixed Cost X 100
-----------------------------------

Annual Fixed Cost + Profit


7.23 X 100
---------------------

7.23+12.50

=36.6%


Addresses of Machinery and Equipment Suppliers

Septu ( India ) Pvt. Ltd.
12/7, Urban Estate,
Post Box No. 4
Gurgaon - 122 001

Raylon Metal Works
Kondivitta Lane
Post Box 17426
J.B.Nagar, Andheri (E)
Mumbai - 400 059

SSP (Pvt) Ltd.
13th Milestone, Mathura Road
Faridabad - 121003, Haryana

Rohilkhand Eng. Works
Izzatnagar,
Bareilly (U.P.)

Batliboi Engineers ( Bangalore ) Pvt. Ltd.
99/2&3, N.R.Road
Bangalore - 560 002

Narene Tulaman Manufacturers Pvt. Ltd.
Balanagar
Hyderabad - 500 037

M/s. Kodesia Eng Works,
Izzatnagar
Bareilly

Shree Murugan Industries,
Plot No. 68/W, Hootagalli
Industrial Area, Balawadi Post
Mysore – 571186

Nalanda Agro Works
Nalanda Nagar, Kurji
Patna - 800 010

Mac-Well Engineering Works,
14, Kartar Compound, LBS Marg
Behind State Bank
Vikroli (West)
Mumbai